Bosnia and Herzegovina vs Czechia: Electricity production capacities for renewables and wastes
Bosnia and Herzegovina
2,298 Megawatt
in 2024
Czechia
2,290 Megawatt
in 2024
Bosnia and Herzegovina rank
22nd
Czechia rank
23rd
Electricity production capacities for renewables and wastes over time
- Bosnia and Herzegovina
- Czechia
How they compare
Bosnia and Herzegovina currently reports 2,298 Megawatt against 2,290 Megawatt in Czechia, a difference of 8 Megawatt.
The two have swapped places 1 time across 11 shared years of data; in 2014 it was Czechia ahead.
Bosnia and Herzegovina ranks 22nd and Czechia ranks 23rd of 51 countries.
Czechia has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Bosnia and Herzegovina | Czechia | Difference | Ahead |
|---|---|---|---|---|
| 2010s | 1,114 Megawatt | 2,261 Megawatt | 1,147 Megawatt | Czechia |
| 2020s | 2,265 Megawatt | 2,283 Megawatt | 17.91 Megawatt | Czechia |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher electricity production capacities for renewables and wastes, Bosnia and Herzegovina or Czechia?
- Bosnia and Herzegovina, at 2,298 Megawatt against 2,290 Megawatt in Czechia as of 2024.
- What is the difference in electricity production capacities for renewables and wastes between Bosnia and Herzegovina and Czechia?
- 8 Megawatt, with Bosnia and Herzegovina ahead.
- How many years of comparable data are there for Bosnia and Herzegovina and Czechia?
- 11 years are reported by both, from 2014 to 2024.
- How do Bosnia and Herzegovina and Czechia rank globally for electricity production capacities for renewables and wastes?
- Bosnia and Herzegovina ranks 22nd and Czechia ranks 23rd of 51 countries.
- Where does this data come from?
- Eurostat, published as Electricity production capacities for renewables and wastes. Statizoid refreshes it automatically from the source and publishes the full history for both places.