Kosovo* vs Netherlands: Electricity production capacities for renewables and wastes
Kosovo*
110.13
in 2024
Netherlands
37.7
in 2024
Kosovo* rank
31st
Netherlands rank
33rd
Electricity production capacities for renewables and wastes over time
- Kosovo*
- Netherlands
How they compare
Kosovo* currently reports 110.13 against 37.7 in Netherlands, a difference of 72.43.
That makes Kosovo*'s figure about 2.9 times Netherlands's.
The two have swapped places 1 time across 25 shared years of data; in 2000 it was Netherlands ahead.
Kosovo* ranks 31st and Netherlands ranks 33rd of 40 countries.
Across the 3 decades both report, Kosovo* averaged higher in 2 and Netherlands in 1.
Head to head by decade
| Decade | Kosovo* | Netherlands | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 35.2 | 37 | 1.8 | Netherlands |
| 2010s | 59.11 | 37 | 22.11 | Kosovo* |
| 2020s | 110.13 | 37.56 | 72.57 | Kosovo* |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher electricity production capacities for renewables and wastes, Kosovo* or Netherlands?
- Kosovo*, at 110.13 against 37.7 in Netherlands as of 2024.
- What is the difference in electricity production capacities for renewables and wastes between Kosovo* and Netherlands?
- 72.43, with Kosovo* ahead.
- How many years of comparable data are there for Kosovo* and Netherlands?
- 25 years are reported by both, from 2000 to 2024.
- How do Kosovo* and Netherlands rank globally for electricity production capacities for renewables and wastes?
- Kosovo* ranks 31st and Netherlands ranks 33rd of 40 countries.
- Where does this data come from?
- Eurostat, published as Electricity production capacities for renewables and wastes. Statizoid refreshes it automatically from the source and publishes the full history for both places.