Botswana vs Republic of Moldova: Nutrient nitrogen N (total) — Export quantity, gaps filled
Nutrient nitrogen N (total) — Export quantity, gaps filled over time
- Botswana
- Republic of Moldova
How they compare
Republic of Moldova currently reports 232 t against 157 t in Botswana, a difference of 75 t.
That makes Republic of Moldova's figure about 1.5 times Botswana's.
The two have swapped places 11 times across 33 shared years of data; in 1992 it was Botswana ahead.
Botswana ranks 122nd and Republic of Moldova ranks 119th of 216 countries.
Across the 4 decades both report, Botswana averaged higher in 3 and Republic of Moldova in 1.
Head to head by decade
| Decade | Botswana | Republic of Moldova | Difference | Ahead |
|---|---|---|---|---|
| 1990s | 15 t | 0 t | 15 t | Botswana |
| 2000s | 19.7 t | 304.3 t | 284.6 t | Republic of Moldova |
| 2010s | 25.3 t | 6.2 t | 19.1 t | Botswana |
| 2020s | 101.8 t | 97.4 t | 4.4 t | Botswana |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher nutrient nitrogen n (total) — export quantity, gaps filled, Botswana or Republic of Moldova?
- Republic of Moldova, at 232 t against 157 t in Botswana as of 2024.
- What is the difference in nutrient nitrogen n (total) — export quantity, gaps filled between Botswana and Republic of Moldova?
- 75 t, with Republic of Moldova ahead.
- How many years of comparable data are there for Botswana and Republic of Moldova?
- 33 years are reported by both, from 1992 to 2024.
- How do Botswana and Republic of Moldova rank globally for nutrient nitrogen n (total) — export quantity, gaps filled?
- Botswana ranks 122nd and Republic of Moldova ranks 119th of 216 countries.
- Where does this data come from?
- Statizoid (derived), published as Nutrient nitrogen N (total) — Export quantity, gaps filled. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Nutrient nitrogen N (total) — Export quantity with 86 missing years estimated by linear interpolation between the nearest real observations. Only gaps of 4 years or fewer are filled, and never beyond the first or last actual measurement — these are filled holes, not forecasts.