Albania vs Botswana: Nutrient nitrogen N (total) — Import quantity, gaps filled
Albania
17,021 t
in 2024
Botswana
17,705 t
in 2024
Albania rank
129th
Botswana rank
128th
Nutrient nitrogen N (total) — Import quantity, gaps filled over time
- Albania
- Botswana
How they compare
Botswana currently reports 17,705 t against 17,021 t in Albania, a difference of 684 t.
The two have swapped places 17 times across 47 shared years of data; in 1961 it was Albania ahead.
Albania ranks 129th and Botswana ranks 128th of 218 countries.
Across the 6 decades both report, Albania averaged higher in 5 and Botswana in 1.
Head to head by decade
| Decade | Albania | Botswana | Difference | Ahead |
|---|---|---|---|---|
| 1960s | 2,273 t | 1,500 t | 773.38 t | Albania |
| 1970s | 325 t | 1,215 t | 890.25 t | Botswana |
| 1990s | 6,652 t | 1,887 t | 4,765 t | Albania |
| 2000s | 20,705 t | 9,505 t | 11,200 t | Albania |
| 2010s | 18,511 t | 14,133 t | 4,377 t | Albania |
| 2020s | 17,747 t | 15,652 t | 2,095 t | Albania |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher nutrient nitrogen n (total) — import quantity, gaps filled, Albania or Botswana?
- Botswana, at 17,705 t against 17,021 t in Albania as of 2024.
- What is the difference in nutrient nitrogen n (total) — import quantity, gaps filled between Albania and Botswana?
- 684 t, with Botswana ahead.
- How many years of comparable data are there for Albania and Botswana?
- 47 years are reported by both, from 1961 to 2024.
- How do Albania and Botswana rank globally for nutrient nitrogen n (total) — import quantity, gaps filled?
- Albania ranks 129th and Botswana ranks 128th of 218 countries.
- Where does this data come from?
- Statizoid (derived), published as Nutrient nitrogen N (total) — Import quantity, gaps filled. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Nutrient nitrogen N (total) — Import quantity with 74 missing years estimated by linear interpolation between the nearest real observations. Only gaps of 4 years or fewer are filled, and never beyond the first or last actual measurement — these are filled holes, not forecasts.