Bulgaria vs Serbia: Nutrient nitrogen N (total) — Import quantity, gaps filled
Bulgaria
248,731 t
in 2024
Serbia
271,298 t
in 2024
Bulgaria rank
41st
Serbia rank
40th
Nutrient nitrogen N (total) — Import quantity, gaps filled over time
- Bulgaria
- Serbia
How they compare
Serbia currently reports 271,298 t against 248,731 t in Bulgaria, a difference of 22,567 t.
That makes Serbia's figure about 1.1 times Bulgaria's.
The two have swapped places 6 times across 19 shared years of data; in 2006 it was Serbia ahead.
Bulgaria ranks 41st and Serbia ranks 40th of 218 countries.
Across the 3 decades both report, Bulgaria averaged higher in 2 and Serbia in 1.
Head to head by decade
| Decade | Bulgaria | Serbia | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 61,696 t | 184,430 t | 122,734 t | Serbia |
| 2010s | 228,203 t | 167,726 t | 60,476 t | Bulgaria |
| 2020s | 262,016 t | 254,681 t | 7,335 t | Bulgaria |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher nutrient nitrogen n (total) — import quantity, gaps filled, Bulgaria or Serbia?
- Serbia, at 271,298 t against 248,731 t in Bulgaria as of 2024.
- What is the difference in nutrient nitrogen n (total) — import quantity, gaps filled between Bulgaria and Serbia?
- 22,567 t, with Serbia ahead.
- How many years of comparable data are there for Bulgaria and Serbia?
- 19 years are reported by both, from 2006 to 2024.
- How do Bulgaria and Serbia rank globally for nutrient nitrogen n (total) — import quantity, gaps filled?
- Bulgaria ranks 41st and Serbia ranks 40th of 218 countries.
- Where does this data come from?
- Statizoid (derived), published as Nutrient nitrogen N (total) — Import quantity, gaps filled. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Nutrient nitrogen N (total) — Import quantity with 74 missing years estimated by linear interpolation between the nearest real observations. Only gaps of 4 years or fewer are filled, and never beyond the first or last actual measurement — these are filled holes, not forecasts.