Eritrea vs Gambia: Nutrient nitrogen N (total) — Import quantity, gaps filled
Eritrea
1,649 t
in 2024
Gambia
1,541 t
in 2024
Eritrea rank
172nd
Gambia rank
174th
Nutrient nitrogen N (total) — Import quantity, gaps filled over time
- Eritrea
- Gambia
How they compare
Eritrea currently reports 1,649 t against 1,541 t in Gambia, a difference of 108 t.
That makes Eritrea's figure about 1.1 times Gambia's.
The two have swapped places 8 times across 32 shared years of data; in 1993 it was Eritrea ahead.
Eritrea ranks 172nd and Gambia ranks 174th of 218 countries.
Eritrea has averaged higher in every one of the 4 decades both report.
Head to head by decade
| Decade | Eritrea | Gambia | Difference | Ahead |
|---|---|---|---|---|
| 1990s | 3,419 t | 649.86 t | 2,769 t | Eritrea |
| 2000s | 1,604 t | 232.3 t | 1,372 t | Eritrea |
| 2010s | 2,218 t | 424.9 t | 1,793 t | Eritrea |
| 2020s | 2,495 t | 1,539 t | 956.6 t | Eritrea |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher nutrient nitrogen n (total) — import quantity, gaps filled, Eritrea or Gambia?
- Eritrea, at 1,649 t against 1,541 t in Gambia as of 2024.
- What is the difference in nutrient nitrogen n (total) — import quantity, gaps filled between Eritrea and Gambia?
- 108 t, with Eritrea ahead.
- How many years of comparable data are there for Eritrea and Gambia?
- 32 years are reported by both, from 1993 to 2024.
- How do Eritrea and Gambia rank globally for nutrient nitrogen n (total) — import quantity, gaps filled?
- Eritrea ranks 172nd and Gambia ranks 174th of 218 countries.
- Where does this data come from?
- Statizoid (derived), published as Nutrient nitrogen N (total) — Import quantity, gaps filled. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Nutrient nitrogen N (total) — Import quantity with 74 missing years estimated by linear interpolation between the nearest real observations. Only gaps of 4 years or fewer are filled, and never beyond the first or last actual measurement — these are filled holes, not forecasts.