Namibia vs Nepal: Nutrient nitrogen N (total) — Import quantity, gaps filled
Namibia
74,624 t
in 2024
Nepal
67,474 t
in 2024
Namibia rank
85th
Nepal rank
87th
Nutrient nitrogen N (total) — Import quantity, gaps filled over time
- Namibia
- Nepal
How they compare
Namibia currently reports 74,624 t against 67,474 t in Nepal, a difference of 7,150 t.
That makes Namibia's figure about 1.1 times Nepal's.
The two have swapped places 3 times across 35 shared years of data; in 1990 it was Nepal ahead.
Namibia ranks 85th and Nepal ranks 87th of 218 countries.
Nepal has averaged higher in every one of the 4 decades both report.
Head to head by decade
| Decade | Namibia | Nepal | Difference | Ahead |
|---|---|---|---|---|
| 1990s | 824.8 t | 68,146 t | 67,321 t | Nepal |
| 2000s | 2,843 t | 19,652 t | 16,810 t | Nepal |
| 2010s | 11,885 t | 96,681 t | 84,796 t | Nepal |
| 2020s | 23,350 t | 91,078 t | 67,728 t | Nepal |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher nutrient nitrogen n (total) — import quantity, gaps filled, Namibia or Nepal?
- Namibia, at 74,624 t against 67,474 t in Nepal as of 2024.
- What is the difference in nutrient nitrogen n (total) — import quantity, gaps filled between Namibia and Nepal?
- 7,150 t, with Namibia ahead.
- How many years of comparable data are there for Namibia and Nepal?
- 35 years are reported by both, from 1990 to 2024.
- How do Namibia and Nepal rank globally for nutrient nitrogen n (total) — import quantity, gaps filled?
- Namibia ranks 85th and Nepal ranks 87th of 218 countries.
- Where does this data come from?
- Statizoid (derived), published as Nutrient nitrogen N (total) — Import quantity, gaps filled. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Nutrient nitrogen N (total) — Import quantity with 74 missing years estimated by linear interpolation between the nearest real observations. Only gaps of 4 years or fewer are filled, and never beyond the first or last actual measurement — these are filled holes, not forecasts.