Pakistan vs Serbia: Nutrient nitrogen N (total) — Import quantity, gaps filled
Pakistan
296,794 t
in 2024
Serbia
271,298 t
in 2024
Pakistan rank
39th
Serbia rank
40th
Nutrient nitrogen N (total) — Import quantity, gaps filled over time
- Pakistan
- Serbia
How they compare
Pakistan currently reports 296,794 t against 271,298 t in Serbia, a difference of 25,496 t.
That makes Pakistan's figure about 1.1 times Serbia's.
The two have swapped places 4 times across 19 shared years of data; in 2006 it was Pakistan ahead.
Pakistan ranks 39th and Serbia ranks 40th of 218 countries.
Across the 3 decades both report, Pakistan averaged higher in 2 and Serbia in 1.
Head to head by decade
| Decade | Pakistan | Serbia | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 412,826 t | 184,430 t | 228,395 t | Pakistan |
| 2010s | 463,114 t | 167,726 t | 295,388 t | Pakistan |
| 2020s | 252,291 t | 254,681 t | 2,390 t | Serbia |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher nutrient nitrogen n (total) — import quantity, gaps filled, Pakistan or Serbia?
- Pakistan, at 296,794 t against 271,298 t in Serbia as of 2024.
- What is the difference in nutrient nitrogen n (total) — import quantity, gaps filled between Pakistan and Serbia?
- 25,496 t, with Pakistan ahead.
- How many years of comparable data are there for Pakistan and Serbia?
- 19 years are reported by both, from 2006 to 2024.
- How do Pakistan and Serbia rank globally for nutrient nitrogen n (total) — import quantity, gaps filled?
- Pakistan ranks 39th and Serbia ranks 40th of 218 countries.
- Where does this data come from?
- Statizoid (derived), published as Nutrient nitrogen N (total) — Import quantity, gaps filled. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Nutrient nitrogen N (total) — Import quantity with 74 missing years estimated by linear interpolation between the nearest real observations. Only gaps of 4 years or fewer are filled, and never beyond the first or last actual measurement — these are filled holes, not forecasts.