Bermuda vs Singapore: Nutrient phosphate P2O5 (total) — Agricultural Use, gaps filled
Bermuda
14 t
in 2024
Singapore
12 t
in 2024
Bermuda rank
190th
Singapore rank
193rd
Nutrient phosphate P2O5 (total) — Agricultural Use, gaps filled over time
- Bermuda
- Singapore
How they compare
Bermuda currently reports 14 t against 12 t in Singapore, a difference of 2 t.
That makes Bermuda's figure about 1.2 times Singapore's.
The two have swapped places 5 times across 15 shared years of data; in 1985 it was Singapore ahead.
Bermuda ranks 190th and Singapore ranks 193rd of 212 countries.
Singapore has averaged higher in every one of the 3 decades both report.
Head to head by decade
| Decade | Bermuda | Singapore | Difference | Ahead |
|---|---|---|---|---|
| 1980s | 13 t | 500 t | 487 t | Singapore |
| 2010s | 14.86 t | 182.71 t | 167.86 t | Singapore |
| 2020s | 7.9 t | 11.6 t | 3.7 t | Singapore |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher nutrient phosphate p2o5 (total) — agricultural use, gaps filled, Bermuda or Singapore?
- Bermuda, at 14 t against 12 t in Singapore as of 2024.
- What is the difference in nutrient phosphate p2o5 (total) — agricultural use, gaps filled between Bermuda and Singapore?
- 2 t, with Bermuda ahead.
- How many years of comparable data are there for Bermuda and Singapore?
- 15 years are reported by both, from 1985 to 2024.
- How do Bermuda and Singapore rank globally for nutrient phosphate p2o5 (total) — agricultural use, gaps filled?
- Bermuda ranks 190th and Singapore ranks 193rd of 212 countries.
- Where does this data come from?
- Statizoid (derived), published as Nutrient phosphate P2O5 (total) — Agricultural Use, gaps filled. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Nutrient phosphate P2O5 (total) — Agricultural Use with 115 missing years estimated by linear interpolation between the nearest real observations. Only gaps of 4 years or fewer are filled, and never beyond the first or last actual measurement — these are filled holes, not forecasts.