Angola vs Georgia: Nutrient phosphate P2O5 (total) — Export quantity, gaps filled
Angola
142 t
in 2024
Georgia
157 t
in 2024
Angola rank
95th
Georgia rank
94th
Nutrient phosphate P2O5 (total) — Export quantity, gaps filled over time
- Angola
- Georgia
How they compare
Georgia currently reports 157 t against 142 t in Angola, a difference of 15 t.
That makes Georgia's figure about 1.1 times Angola's.
The two have swapped places 6 times across 33 shared years of data; in 1992 it was Georgia ahead.
Angola ranks 95th and Georgia ranks 94th of 217 countries.
Across the 4 decades both report, Angola averaged higher in 2 and Georgia in 1.
Head to head by decade
| Decade | Angola | Georgia | Difference | Ahead |
|---|---|---|---|---|
| 1990s | 0 t | 0 t | 0 t | — |
| 2000s | 0 t | 4.5 t | 4.5 t | Georgia |
| 2010s | 8.9 t | 4.6 t | 4.3 t | Angola |
| 2020s | 102.6 t | 58 t | 44.6 t | Angola |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher nutrient phosphate p2o5 (total) — export quantity, gaps filled, Angola or Georgia?
- Georgia, at 157 t against 142 t in Angola as of 2024.
- What is the difference in nutrient phosphate p2o5 (total) — export quantity, gaps filled between Angola and Georgia?
- 15 t, with Georgia ahead.
- How many years of comparable data are there for Angola and Georgia?
- 33 years are reported by both, from 1992 to 2024.
- How do Angola and Georgia rank globally for nutrient phosphate p2o5 (total) — export quantity, gaps filled?
- Angola ranks 95th and Georgia ranks 94th of 217 countries.
- Where does this data come from?
- Statizoid (derived), published as Nutrient phosphate P2O5 (total) — Export quantity, gaps filled. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Nutrient phosphate P2O5 (total) — Export quantity with 81 missing years estimated by linear interpolation between the nearest real observations. Only gaps of 4 years or fewer are filled, and never beyond the first or last actual measurement — these are filled holes, not forecasts.