Angola vs Ukraine: Nutrient phosphate P2O5 (total) — Export quantity, gaps filled
Angola
142 t
in 2024
Ukraine
134 t
in 2024
Angola rank
95th
Ukraine rank
97th
Nutrient phosphate P2O5 (total) — Export quantity, gaps filled over time
- Angola
- Ukraine
How they compare
Angola currently reports 142 t against 134 t in Ukraine, a difference of 8 t.
That makes Angola's figure about 1.1 times Ukraine's.
The two have swapped places 1 time across 33 shared years of data; in 1992 it was Ukraine ahead.
Angola ranks 95th and Ukraine ranks 97th of 217 countries.
Ukraine has averaged higher in every one of the 4 decades both report.
Head to head by decade
| Decade | Angola | Ukraine | Difference | Ahead |
|---|---|---|---|---|
| 1990s | 0 t | 165,638 t | 165,638 t | Ukraine |
| 2000s | 0 t | 47,527 t | 47,527 t | Ukraine |
| 2010s | 8.9 t | 17,419 t | 17,410 t | Ukraine |
| 2020s | 102.6 t | 377 t | 274.4 t | Ukraine |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher nutrient phosphate p2o5 (total) — export quantity, gaps filled, Angola or Ukraine?
- Angola, at 142 t against 134 t in Ukraine as of 2024.
- What is the difference in nutrient phosphate p2o5 (total) — export quantity, gaps filled between Angola and Ukraine?
- 8 t, with Angola ahead.
- How many years of comparable data are there for Angola and Ukraine?
- 33 years are reported by both, from 1992 to 2024.
- How do Angola and Ukraine rank globally for nutrient phosphate p2o5 (total) — export quantity, gaps filled?
- Angola ranks 95th and Ukraine ranks 97th of 217 countries.
- Where does this data come from?
- Statizoid (derived), published as Nutrient phosphate P2O5 (total) — Export quantity, gaps filled. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Nutrient phosphate P2O5 (total) — Export quantity with 81 missing years estimated by linear interpolation between the nearest real observations. Only gaps of 4 years or fewer are filled, and never beyond the first or last actual measurement — these are filled holes, not forecasts.