Eritrea vs Micronesia: Nutrient phosphate P2O5 (total) — Export quantity, gaps filled
Eritrea
0 t
in 2024
Micronesia
0 t
in 2024
Eritrea rank
126th
Micronesia rank
126th
Nutrient phosphate P2O5 (total) — Export quantity, gaps filled over time
- Eritrea
- Micronesia
How they compare
Eritrea currently reports 0 t against 0 t in Micronesia, a difference of 0 t.
Across all 32 years both countries report, Micronesia has been ahead every year.
Eritrea ranks 126th and Micronesia ranks 126th of 217 countries.
Micronesia has averaged higher in every one of the 4 decades both report.
Head to head by decade
| Decade | Eritrea | Micronesia | Difference | Ahead |
|---|---|---|---|---|
| 1990s | 0 t | 0 t | 0 t | — |
| 2000s | 0 t | 557.6 t | 557.6 t | Micronesia |
| 2010s | 53.8 t | 589.3 t | 535.5 t | Micronesia |
| 2020s | 0 t | 53 t | 53 t | Micronesia |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher nutrient phosphate p2o5 (total) — export quantity, gaps filled, Eritrea or Micronesia?
- Eritrea, at 0 t against 0 t in Micronesia as of 2024.
- What is the difference in nutrient phosphate p2o5 (total) — export quantity, gaps filled between Eritrea and Micronesia?
- 0 t, with Eritrea ahead.
- How many years of comparable data are there for Eritrea and Micronesia?
- 32 years are reported by both, from 1993 to 2024.
- How do Eritrea and Micronesia rank globally for nutrient phosphate p2o5 (total) — export quantity, gaps filled?
- Eritrea ranks 126th and Micronesia ranks 126th of 217 countries.
- Where does this data come from?
- Statizoid (derived), published as Nutrient phosphate P2O5 (total) — Export quantity, gaps filled. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Nutrient phosphate P2O5 (total) — Export quantity with 81 missing years estimated by linear interpolation between the nearest real observations. Only gaps of 4 years or fewer are filled, and never beyond the first or last actual measurement — these are filled holes, not forecasts.