Micronesia vs Montenegro: Nutrient phosphate P2O5 (total) — Export quantity, gaps filled
Micronesia
0 t
in 2024
Montenegro
1 t
in 2024
Micronesia rank
126th
Montenegro rank
124th
Nutrient phosphate P2O5 (total) — Export quantity, gaps filled over time
- Micronesia
- Montenegro
How they compare
Montenegro currently reports 1 t against 0 t in Micronesia, a difference of 1 t.
The two have swapped places 1 time across 19 shared years of data; in 2006 it was Micronesia ahead.
Micronesia ranks 126th and Montenegro ranks 124th of 217 countries.
Micronesia has averaged higher in every one of the 3 decades both report.
Head to head by decade
| Decade | Micronesia | Montenegro | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 697 t | 0 t | 697 t | Micronesia |
| 2010s | 589.3 t | 2 t | 587.3 t | Micronesia |
| 2020s | 53 t | 0.2 t | 52.8 t | Micronesia |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher nutrient phosphate p2o5 (total) — export quantity, gaps filled, Micronesia or Montenegro?
- Montenegro, at 1 t against 0 t in Micronesia as of 2024.
- What is the difference in nutrient phosphate p2o5 (total) — export quantity, gaps filled between Micronesia and Montenegro?
- 1 t, with Montenegro ahead.
- How many years of comparable data are there for Micronesia and Montenegro?
- 19 years are reported by both, from 2006 to 2024.
- How do Micronesia and Montenegro rank globally for nutrient phosphate p2o5 (total) — export quantity, gaps filled?
- Micronesia ranks 126th and Montenegro ranks 124th of 217 countries.
- Where does this data come from?
- Statizoid (derived), published as Nutrient phosphate P2O5 (total) — Export quantity, gaps filled. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Nutrient phosphate P2O5 (total) — Export quantity with 81 missing years estimated by linear interpolation between the nearest real observations. Only gaps of 4 years or fewer are filled, and never beyond the first or last actual measurement — these are filled holes, not forecasts.