Montenegro vs Sierra Leone: Nutrient phosphate P2O5 (total) — Export quantity, gaps filled
Montenegro
1 t
in 2024
Sierra Leone
0 t
in 2022
Montenegro rank
124th
Sierra Leone rank
126th
Nutrient phosphate P2O5 (total) — Export quantity, gaps filled over time
- Montenegro
- Sierra Leone
How they compare
Montenegro currently reports 1 t against 0 t in Sierra Leone, a difference of 1 t.
The two have swapped places 4 times across 17 shared years of data; in 2006 it was Sierra Leone ahead.
Montenegro ranks 124th and Sierra Leone ranks 126th of 217 countries.
Across the 3 decades both report, Montenegro averaged higher in 1 and Sierra Leone in 1.
Head to head by decade
| Decade | Montenegro | Sierra Leone | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 0 t | 1.5 t | 1.5 t | Sierra Leone |
| 2010s | 2 t | 0.3 t | 1.7 t | Montenegro |
| 2020s | 0 t | 0 t | 0 t | — |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher nutrient phosphate p2o5 (total) — export quantity, gaps filled, Montenegro or Sierra Leone?
- Montenegro, at 1 t against 0 t in Sierra Leone as of 2024.
- What is the difference in nutrient phosphate p2o5 (total) — export quantity, gaps filled between Montenegro and Sierra Leone?
- 1 t, with Montenegro ahead.
- How many years of comparable data are there for Montenegro and Sierra Leone?
- 17 years are reported by both, from 2006 to 2022.
- How do Montenegro and Sierra Leone rank globally for nutrient phosphate p2o5 (total) — export quantity, gaps filled?
- Montenegro ranks 124th and Sierra Leone ranks 126th of 217 countries.
- Where does this data come from?
- Statizoid (derived), published as Nutrient phosphate P2O5 (total) — Export quantity, gaps filled. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Nutrient phosphate P2O5 (total) — Export quantity with 81 missing years estimated by linear interpolation between the nearest real observations. Only gaps of 4 years or fewer are filled, and never beyond the first or last actual measurement — these are filled holes, not forecasts.