Sri Lanka vs Zimbabwe: Nutrient phosphate P2O5 (total) — Export quantity, gaps filled
Sri Lanka
0 t
in 2024
Zimbabwe
0 t
in 2023
Sri Lanka rank
126th
Zimbabwe rank
126th
Nutrient phosphate P2O5 (total) — Export quantity, gaps filled over time
- Sri Lanka
- Zimbabwe
How they compare
Sri Lanka currently reports 0 t against 0 t in Zimbabwe, a difference of 0 t.
The two have swapped places 5 times across 34 shared years of data; in 1990 it was Zimbabwe ahead.
Sri Lanka ranks 126th and Zimbabwe ranks 126th of 217 countries.
Zimbabwe has averaged higher in every one of the 4 decades both report.
Head to head by decade
| Decade | Sri Lanka | Zimbabwe | Difference | Ahead |
|---|---|---|---|---|
| 1990s | 8.4 t | 1,569 t | 1,560 t | Zimbabwe |
| 2000s | 47.6 t | 2,690 t | 2,643 t | Zimbabwe |
| 2010s | 30.2 t | 2,232 t | 2,202 t | Zimbabwe |
| 2020s | 14.25 t | 249.25 t | 235 t | Zimbabwe |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher nutrient phosphate p2o5 (total) — export quantity, gaps filled, Sri Lanka or Zimbabwe?
- Sri Lanka, at 0 t against 0 t in Zimbabwe as of 2024.
- What is the difference in nutrient phosphate p2o5 (total) — export quantity, gaps filled between Sri Lanka and Zimbabwe?
- 0 t, with Sri Lanka ahead.
- How many years of comparable data are there for Sri Lanka and Zimbabwe?
- 34 years are reported by both, from 1990 to 2023.
- How do Sri Lanka and Zimbabwe rank globally for nutrient phosphate p2o5 (total) — export quantity, gaps filled?
- Sri Lanka ranks 126th and Zimbabwe ranks 126th of 217 countries.
- Where does this data come from?
- Statizoid (derived), published as Nutrient phosphate P2O5 (total) — Export quantity, gaps filled. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Nutrient phosphate P2O5 (total) — Export quantity with 81 missing years estimated by linear interpolation between the nearest real observations. Only gaps of 4 years or fewer are filled, and never beyond the first or last actual measurement — these are filled holes, not forecasts.