Greenland vs Tonga: Nutrient phosphate P2O5 (total) — Import quantity, gaps filled
Greenland
17 t
in 2024
Tonga
13 t
in 2024
Greenland rank
194th
Tonga rank
197th
Nutrient phosphate P2O5 (total) — Import quantity, gaps filled over time
- Greenland
- Tonga
How they compare
Greenland currently reports 17 t against 13 t in Tonga, a difference of 4 t.
That makes Greenland's figure about 1.3 times Tonga's.
The two have swapped places 9 times across 35 shared years of data; in 1990 it was Tonga ahead.
Greenland ranks 194th and Tonga ranks 197th of 217 countries.
Across the 4 decades both report, Greenland averaged higher in 1 and Tonga in 3.
Head to head by decade
| Decade | Greenland | Tonga | Difference | Ahead |
|---|---|---|---|---|
| 1990s | 28.3 t | 0 t | 28.3 t | Greenland |
| 2000s | 78.9 t | 123.3 t | 44.4 t | Tonga |
| 2010s | 35.9 t | 54.6 t | 18.7 t | Tonga |
| 2020s | 17 t | 32.4 t | 15.4 t | Tonga |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher nutrient phosphate p2o5 (total) — import quantity, gaps filled, Greenland or Tonga?
- Greenland, at 17 t against 13 t in Tonga as of 2024.
- What is the difference in nutrient phosphate p2o5 (total) — import quantity, gaps filled between Greenland and Tonga?
- 4 t, with Greenland ahead.
- How many years of comparable data are there for Greenland and Tonga?
- 35 years are reported by both, from 1990 to 2024.
- How do Greenland and Tonga rank globally for nutrient phosphate p2o5 (total) — import quantity, gaps filled?
- Greenland ranks 194th and Tonga ranks 197th of 217 countries.
- Where does this data come from?
- Statizoid (derived), published as Nutrient phosphate P2O5 (total) — Import quantity, gaps filled. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Nutrient phosphate P2O5 (total) — Import quantity with 117 missing years estimated by linear interpolation between the nearest real observations. Only gaps of 4 years or fewer are filled, and never beyond the first or last actual measurement — these are filled holes, not forecasts.