Niger vs Tunisia: Nutrient phosphate P2O5 (total) — Import quantity, gaps filled
Niger
4,000 t
in 2024
Tunisia
3,855 t
in 2024
Niger rank
135th
Tunisia rank
137th
Nutrient phosphate P2O5 (total) — Import quantity, gaps filled over time
- Niger
- Tunisia
How they compare
Niger currently reports 4,000 t against 3,855 t in Tunisia, a difference of 145 t.
The two have swapped places 16 times across 36 shared years of data; in 1984 it was Niger ahead.
Niger ranks 135th and Tunisia ranks 137th of 217 countries.
Niger has averaged higher in every one of the 5 decades both report.
Head to head by decade
| Decade | Niger | Tunisia | Difference | Ahead |
|---|---|---|---|---|
| 1980s | 738 t | 280 t | 458 t | Niger |
| 1990s | 938.6 t | 192.9 t | 745.7 t | Niger |
| 2000s | 1,296 t | 913 t | 383.5 t | Niger |
| 2010s | 1,665 t | 1,362 t | 302.6 t | Niger |
| 2020s | 2,801 t | 2,424 t | 377 t | Niger |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher nutrient phosphate p2o5 (total) — import quantity, gaps filled, Niger or Tunisia?
- Niger, at 4,000 t against 3,855 t in Tunisia as of 2024.
- What is the difference in nutrient phosphate p2o5 (total) — import quantity, gaps filled between Niger and Tunisia?
- 145 t, with Niger ahead.
- How many years of comparable data are there for Niger and Tunisia?
- 36 years are reported by both, from 1984 to 2024.
- How do Niger and Tunisia rank globally for nutrient phosphate p2o5 (total) — import quantity, gaps filled?
- Niger ranks 135th and Tunisia ranks 137th of 217 countries.
- Where does this data come from?
- Statizoid (derived), published as Nutrient phosphate P2O5 (total) — Import quantity, gaps filled. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Nutrient phosphate P2O5 (total) — Import quantity with 117 missing years estimated by linear interpolation between the nearest real observations. Only gaps of 4 years or fewer are filled, and never beyond the first or last actual measurement — these are filled holes, not forecasts.