Bermuda vs Tonga: Nutrient potash K2O (total) — Import quantity, gaps filled
Bermuda
13 t
in 2024
Tonga
12 t
in 2024
Bermuda rank
194th
Tonga rank
195th
Nutrient potash K2O (total) — Import quantity, gaps filled over time
- Bermuda
- Tonga
How they compare
Bermuda currently reports 13 t against 12 t in Tonga, a difference of 1 t.
That makes Bermuda's figure about 1.1 times Tonga's.
The two have swapped places 4 times across 37 shared years of data; in 1982 it was Bermuda ahead.
Bermuda ranks 194th and Tonga ranks 195th of 216 countries.
Across the 5 decades both report, Bermuda averaged higher in 1 and Tonga in 3.
Head to head by decade
| Decade | Bermuda | Tonga | Difference | Ahead |
|---|---|---|---|---|
| 1980s | 68 t | 36 t | 32 t | Bermuda |
| 1990s | 0 t | 0 t | 0 t | — |
| 2000s | 6 t | 123 t | 117 t | Tonga |
| 2010s | 21.8 t | 65.2 t | 43.4 t | Tonga |
| 2020s | 18.2 t | 32 t | 13.8 t | Tonga |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher nutrient potash k2o (total) — import quantity, gaps filled, Bermuda or Tonga?
- Bermuda, at 13 t against 12 t in Tonga as of 2024.
- What is the difference in nutrient potash k2o (total) — import quantity, gaps filled between Bermuda and Tonga?
- 1 t, with Bermuda ahead.
- How many years of comparable data are there for Bermuda and Tonga?
- 37 years are reported by both, from 1982 to 2024.
- How do Bermuda and Tonga rank globally for nutrient potash k2o (total) — import quantity, gaps filled?
- Bermuda ranks 194th and Tonga ranks 195th of 216 countries.
- Where does this data come from?
- Statizoid (derived), published as Nutrient potash K2O (total) — Import quantity, gaps filled. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Nutrient potash K2O (total) — Import quantity with 83 missing years estimated by linear interpolation between the nearest real observations. Only gaps of 4 years or fewer are filled, and never beyond the first or last actual measurement — these are filled holes, not forecasts.