Montenegro vs Suriname: Nutrient potash K2O (total) — Import quantity, gaps filled
Montenegro
622 t
in 2024
Suriname
757 t
in 2024
Montenegro rank
166th
Suriname rank
163rd
Nutrient potash K2O (total) — Import quantity, gaps filled over time
- Montenegro
- Suriname
How they compare
Suriname currently reports 757 t against 622 t in Montenegro, a difference of 135 t.
That makes Suriname's figure about 1.2 times Montenegro's.
The two have swapped places 2 times across 19 shared years of data; in 2006 it was Suriname ahead.
Montenegro ranks 166th and Suriname ranks 163rd of 216 countries.
Suriname has averaged higher in every one of the 3 decades both report.
Head to head by decade
| Decade | Montenegro | Suriname | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 601 t | 1,998 t | 1,397 t | Suriname |
| 2010s | 527.9 t | 1,196 t | 668.2 t | Suriname |
| 2020s | 580.2 t | 684.2 t | 104 t | Suriname |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher nutrient potash k2o (total) — import quantity, gaps filled, Montenegro or Suriname?
- Suriname, at 757 t against 622 t in Montenegro as of 2024.
- What is the difference in nutrient potash k2o (total) — import quantity, gaps filled between Montenegro and Suriname?
- 135 t, with Suriname ahead.
- How many years of comparable data are there for Montenegro and Suriname?
- 19 years are reported by both, from 2006 to 2024.
- How do Montenegro and Suriname rank globally for nutrient potash k2o (total) — import quantity, gaps filled?
- Montenegro ranks 166th and Suriname ranks 163rd of 216 countries.
- Where does this data come from?
- Statizoid (derived), published as Nutrient potash K2O (total) — Import quantity, gaps filled. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Nutrient potash K2O (total) — Import quantity with 83 missing years estimated by linear interpolation between the nearest real observations. Only gaps of 4 years or fewer are filled, and never beyond the first or last actual measurement — these are filled holes, not forecasts.