Cambodia vs Zambia: Pesticides (total) — Export value, gaps filled
Cambodia
3,897 1000 USD
in 2024
Zambia
3,836 1000 USD
in 2024
Cambodia rank
89th
Zambia rank
90th
Pesticides (total) — Export value, gaps filled over time
- Cambodia
- Zambia
How they compare
Cambodia currently reports 3,897 1000 USD against 3,836 1000 USD in Zambia, a difference of 61 1000 USD.
The two have swapped places 1 time across 35 shared years of data; in 1990 it was Zambia ahead.
Cambodia ranks 89th and Zambia ranks 90th of 231 countries.
Across the 4 decades both report, Cambodia averaged higher in 1 and Zambia in 3.
Head to head by decade
| Decade | Cambodia | Zambia | Difference | Ahead |
|---|---|---|---|---|
| 1990s | 4.21 1000 USD | 228.82 1000 USD | 224.61 1000 USD | Zambia |
| 2000s | 4.62 1000 USD | 327.44 1000 USD | 322.82 1000 USD | Zambia |
| 2010s | 452.71 1000 USD | 1,778 1000 USD | 1,326 1000 USD | Zambia |
| 2020s | 3,106 1000 USD | 2,292 1000 USD | 813.83 1000 USD | Cambodia |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher pesticides (total) — export value, gaps filled, Cambodia or Zambia?
- Cambodia, at 3,897 1000 USD against 3,836 1000 USD in Zambia as of 2024.
- What is the difference in pesticides (total) — export value, gaps filled between Cambodia and Zambia?
- 61 1000 USD, with Cambodia ahead.
- How many years of comparable data are there for Cambodia and Zambia?
- 35 years are reported by both, from 1990 to 2024.
- How do Cambodia and Zambia rank globally for pesticides (total) — export value, gaps filled?
- Cambodia ranks 89th and Zambia ranks 90th of 231 countries.
- Where does this data come from?
- Statizoid (derived), published as Pesticides (total) — Export value, gaps filled. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Pesticides (total) — Export value with 92 missing years estimated by linear interpolation between the nearest real observations. Only gaps of 4 years or fewer are filled, and never beyond the first or last actual measurement — these are filled holes, not forecasts.