Plywood and LVL — Import value, per square kilometre in Malaysia

Malaysia: Plywood and LVL — Import value, per square kilometre was 1.2 1000 USD per square kilometre in 2023. ◆ Volatile

Latest (2023)
1.2 1000 USD per square kilometre
Change on year
down 2.0%
World rank
45th
of 184 countries
All-time high
1.22 1000 USD per square kilometre
in 2022
All-time low
0.0015 1000 USD per square kilometre
in 1987
Years of data
63
1961–2023

Plywood and LVL — Import value, per square kilometre in Malaysia, 1961–2023

00.250.50.7511.2196119922023

Source: Statizoid (derived). Measured in 1000 USD per square kilometre.

Analysis

Malaysia recorded 1.2 1000 USD per square kilometre for plywood and lvl — import value, per square kilometre in 2023.

The figure is down 2.0% on the previous year and up 196.7% over ten years.

Over the whole period, plywood and lvl — import value, per square kilometre in Malaysia peaked at 1.22 1000 USD per square kilometre in 2022 and was at its lowest, 0.0015 1000 USD per square kilometre, in 1987.

Malaysia ranks 45th of 184 countries on this measure, in the top quarter.

The series is highly variable year to year, so single readings are best treated with caution.

Plywood and LVL — Import value, per square kilometre in Malaysia, year by year

Annual values for Plywood and LVL — Import value, per square kilometre in Malaysia, 1961 to 2023.
Year 1000 USD per square kilometre Change
1961 0.0036 1000 USD per square kilometre
1962 0.0054 1000 USD per square kilometre +48.0%
1963 0.0057 1000 USD per square kilometre +5.7%
1964 0.004 1000 USD per square kilometre -29.9%
1965 0.0028 1000 USD per square kilometre -30.9%
1966 0.0017 1000 USD per square kilometre -38.6%
1967 0.0021 1000 USD per square kilometre +21.6%
1968 0.0016 1000 USD per square kilometre -20.6%
1969 0.002 1000 USD per square kilometre +22.4%
1970 0.0031 1000 USD per square kilometre +57.6%
1971 0.0024 1000 USD per square kilometre -24.7%
1972 0.0045 1000 USD per square kilometre +88.4%
1973 0.005 1000 USD per square kilometre +11.5%
1974 0.0044 1000 USD per square kilometre -12.0%
1975 0.003 1000 USD per square kilometre -31.9%
1976 0.0026 1000 USD per square kilometre -13.4%
1977 0.0055 1000 USD per square kilometre +113.2%
1978 0.0067 1000 USD per square kilometre +22.1%
1979 0.0124 1000 USD per square kilometre +83.8%
1980 0.0163 1000 USD per square kilometre +31.3%
1981 0.0222 1000 USD per square kilometre +36.6%
1982 0.023 1000 USD per square kilometre +3.7%
1983 0.023 1000 USD per square kilometre +0.0%
1984 0.023 1000 USD per square kilometre +0.0%
1985 0.023 1000 USD per square kilometre +0.0%
1986 0.0018 1000 USD per square kilometre -92.4%
1987 0.0015 1000 USD per square kilometre -11.8%
1988 0.0152 1000 USD per square kilometre +886.2%
1989 0.0122 1000 USD per square kilometre -20.0%
1990 0.0122 1000 USD per square kilometre +0.0%
1991 0.0067 1000 USD per square kilometre -45.3%
1992 0.0107 1000 USD per square kilometre +60.3%
1993 0.0172 1000 USD per square kilometre +60.7%
1994 0.0264 1000 USD per square kilometre +53.7%
1995 0.0262 1000 USD per square kilometre -0.8%
1996 0.0101 1000 USD per square kilometre -61.3%
1997 0.0266 1000 USD per square kilometre +163.1%
1998 0.0133 1000 USD per square kilometre -50.2%
1999 0.0216 1000 USD per square kilometre +63.0%
2000 0.018 1000 USD per square kilometre -16.7%
2001 0.0262 1000 USD per square kilometre +45.5%
2002 0.0213 1000 USD per square kilometre -18.7%
2003 0.0317 1000 USD per square kilometre +49.0%
2004 0.018 1000 USD per square kilometre -43.1%
2005 0.0326 1000 USD per square kilometre +80.5%
2006 0.0776 1000 USD per square kilometre +138.3%
2007 0.0811 1000 USD per square kilometre +4.5%
2008 0.1883 1000 USD per square kilometre +132.1%
2009 0.1246 1000 USD per square kilometre -33.8%
2010 0.2393 1000 USD per square kilometre +92.1%
2011 0.3754 1000 USD per square kilometre +56.9%
2012 0.3931 1000 USD per square kilometre +4.7%
2013 0.404 1000 USD per square kilometre +2.8%
2014 0.4522 1000 USD per square kilometre +11.9%
2015 0.468 1000 USD per square kilometre +3.5%
2016 0.4618 1000 USD per square kilometre -1.3%
2017 0.5264 1000 USD per square kilometre +14.0%
2018 0.8658 1000 USD per square kilometre +64.5%
2019 0.8122 1000 USD per square kilometre -6.2%
2020 0.7674 1000 USD per square kilometre -5.5%
2021 1.19 1000 USD per square kilometre +54.8%
2022 1.22 1000 USD per square kilometre +3.0%
2023 1.2 1000 USD per square kilometre -2.0%

Malaysia compared with similar countries

  • Malaysia's 1.2 1000 USD per square kilometre is above the median for upper middle income countries, which is 0.2137 1000 USD per square kilometre, 5.6× the median. (52 countries reporting)
  • Malaysia's 1.2 1000 USD per square kilometre is above the median for East Asia & Pacific, which is 0.3785 1000 USD per square kilometre, 3.2× the median. (28 countries reporting)

Biggest year-on-year movements

Years where Plywood and LVL — Import value, per square kilometre in Malaysia changed far more than this series normally does. A large move can be a real event or a change in how the figure was measured — the source note below says who published it.

YearChange FromTo
1988 +886.2% 0.0015 1000 USD per square kilometre 0.0152 1000 USD per square kilometre

Averages by decade

DecadeAverage LowestHighest Years
1960s 0.0032 1000 USD per square kilometre 0.0016 1000 USD per square kilometre 0.0057 1000 USD per square kilometre 9
1970s 0.005 1000 USD per square kilometre 0.0024 1000 USD per square kilometre 0.0124 1000 USD per square kilometre 10
1980s 0.0161 1000 USD per square kilometre 0.0015 1000 USD per square kilometre 0.023 1000 USD per square kilometre 10
1990s 0.0171 1000 USD per square kilometre 0.0067 1000 USD per square kilometre 0.0266 1000 USD per square kilometre 10
2000s 0.062 1000 USD per square kilometre 0.018 1000 USD per square kilometre 0.1883 1000 USD per square kilometre 10
2010s 0.4998 1000 USD per square kilometre 0.2393 1000 USD per square kilometre 0.8658 1000 USD per square kilometre 10
2020s 1.09 1000 USD per square kilometre 0.7674 1000 USD per square kilometre 1.22 1000 USD per square kilometre 4

Countries ranked near Malaysia

  1. 42 Trinidad and Tobago 1.58 1000 USD per square kilometre compare
  2. 43 Philippines 1.45 1000 USD per square kilometre compare
  3. 44 Italy 1.26 1000 USD per square kilometre compare
  4. 46 Czechia 1.09 1000 USD per square kilometre compare
  5. 47 Tonga 1.07 1000 USD per square kilometre compare
  6. 48 Lithuania 0.9852 1000 USD per square kilometre compare

See the full ranking of 185 places →

More environment data for Malaysia

All data for Malaysia →

Frequently asked questions

What is plywood and lvl — import value, per square kilometre in Malaysia?
Plywood and lvl — import value, per square kilometre in Malaysia was 1.2 1000 USD per square kilometre in 2023, according to Statizoid (derived).
What is the highest plywood and lvl — import value, per square kilometre recorded in Malaysia?
The highest recorded value was 1.22 1000 USD per square kilometre in 2022.
What is the lowest plywood and lvl — import value, per square kilometre recorded in Malaysia?
The lowest recorded value was 0.0015 1000 USD per square kilometre in 1987.
How does Malaysia rank for plywood and lvl — import value, per square kilometre?
Malaysia ranks 45th out of 184 countries with data for 2023.
Is plywood and lvl — import value, per square kilometre rising or falling in Malaysia?
Over the last ten years it is up 196.7%. The long-run trend across the full record is volatile.
Where does this Malaysia data come from?
The figures come from Statizoid (derived), published as part of Plywood and LVL — Import value, per square kilometre. Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 63 observations, free to reuse under Derived by Statizoid from the sources named on the page.

Share, cite or embed this page

Cite this page

Plywood and LVL — Import value, per square kilometre in Malaysia. Statizoid, drawing on Statizoid (derived). Retrieved 22 September 2026, from https://environment.statizoid.com/stat/plywood-and-lvl-import-value-per-square-kilometre/malaysia/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under Derived by Statizoid from the sources named on the page; please keep the attribution.

<a href="https://environment.statizoid.com/stat/plywood-and-lvl-import-value-per-square-kilometre/malaysia/">Plywood and LVL — Import value, per square kilometre in Malaysia</a> — Statizoid

How this figure is calculated

Plywood and LVL — Import value divided by Land area (sq. km), matched on country and year. Neither publisher issues this ratio as a series; it is computed here from both.

Plywood and LVL — Import value ÷ Land area (sq. km)

Computed from

Statizoid computes this series; the underlying measurements belong to the publishers named above. The arithmetic is applied to every country and year where both inputs report, and nothing is estimated unless the page says so.

About this data

Indicator
Plywood and LVL — Import value, per square kilometre
Unit
1000 USD per square kilometre
Source
Statizoid (derived)
Licence
Derived by Statizoid from the sources named on the page
Coverage
185 places, 8,430 data points, 1961–2023
Last refreshed

Plywood and LVL — Import value divided by Land area (sq. km), matched on country and year. Neither publisher issues this ratio as a series; it is computed here from both.